As their Plan to develop Northern Emirates of UAE, the Ministry of Public Works and Housing intended to upgrade the existing two-lane dual carriageway highway from Ras Al Khaimah to Kharan.
Services
Pavement Evaluation and Design
Detailed Engineering Design
Traffic Impact Assessment
ECIL undertook following tasks for the above-mentioned work at (1), (2), and (3)
- Topographic Survey
- Pavement Condition Survey and Evaluation using Heavy Falling Weight Deflectometer
- Pavement Design
- Traffic Study comprised of the following Components:
Turning Movement Counts
Traffic Modelling
Detailed Report on Traffic Impact Assessment
- Hydrological Investigation Study and Detailed Report
- Preliminary Study Report
- Prepared Preliminary Engineering Design and Preliminary Cost Estimates
- Final and detailed Engineering Design
- Final Cost Estimates and Tender Documents