Administration Block, Faculty of Pharmacy, Pharmacy Dean Office & University Clinic at Karachi University Campus
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Karachi
Start Date:
January 2008
Completion Date:
December 2009

Project Description

During the Design Phase, the Consultants shall prepare preliminary plans and details and shall obtain approval of the same, from the Client, in writing, before proceeding for finalization of the same.  Final Design Plans and details shall also be approved before taking off the quantities for preparation of the Tender Documents. The Tender/Final Construction Drawings and Details shall be submitted to the Client for their Approval & Endorsement for issuance to the Contractor(s). The client will give all such approvals within a reasonable time, but not later than 15 days from the time of submission of the preliminary design.

During Construction Supervision Phase, the Consultants shall issue necessary instructions to the Contractor(s), with approval of the Client, for preparation of Work Shop Drawings. The Consultants shall check and approve these drawings.

 

Services

  • All the data that is in custody of the client

  • Facilitating consultants to get approval from the agencies

  • Help and payments to all agencies for any approval that is required

  • Give free and unhindered access to the consultant staff to the site at all time

  • Ensure safety and good working conditions at the site of the project.

  • During the Construction Phase, the Client shall arrange for the following, through the Contractor

  • Furnished, equipped and serviced site office

  • Office supplies & maintenance

  • Communication (Phone, fax, etc.)