Auxiliary Kandar Dam
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Kohat, NWFP
Start Date:
April 1991
Completion Date:
March 1993

Project Description

 

  • This project comprises of 1030 ft. (313.93 m) long earth fill embankment, maximum height 76.5 ft (23.32 m) with 25 ft. (7.62 m) top width

  • Dikes earth-fill embankment 990 ft. (30.17 m) top width 25 ft. (7.62 m) maximum height 16 ft. (4.88 m)

  • Bucket type spillway with ungated free overfall ogee crest weir for peak flood inflow of 9,785 cusecs (277.2 cumecs)

  • 2 ft. (0.61 m) dia R.C.C. outlet pipe with impact type stilling basin

 

Services

  • Survey

  • Geotechnical & geological investigations

  • Planning

  • Detailed design

  • Drawings

  • Engineer's Estimates