Design/Drawings & Tender Documents for Wastewater Treatment Plant of General Tyre & Rubber Company of Pakistan
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Karachi
Start Date:
September 1996
Completion Date:
September 1997

Project Description

Designed wastewater treatment plant of capacity more than 1800 gallons/hour. The treatment process for the raw sewage is based on the activated sludge process. The components of the wastewater treatment plant include bar screen, lift station, primary sedimentation tank, aeration tank, secondary sedimentation tank, sludge recirculation system, effluent disposal chamber and sludge drying beds. This plant treats not only the sewage water, but also industrial wastewater. After treatment, this water can be used for irrigation, but with some restrictions.

 

Services

  • Survey of the project area

  • Sampling & testing of wastewater generated

  • Design external sewerage system linking to wastewater treatment plant

  • Design of wastewater treatment plant

  • Preparation of drawings

  • Preparation of tender documents, cost estimates and specifications