Preparation of Master Plan & Detailed Design of Sewerage & Water Supply System of North Nazimabad and Federal-B Area, Karachi
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Karachi
Start Date:
1983
Completion Date:
1984

Project Description

It was a Master Plan, including detail design of sewerage & water supply network of North Nazimabad and Federal - B Area. It includes:

  • Primary & Secondary Water Mains 6" to 48" diameter

  • Sewerage System 8" to 54" diameter

 

Services

  • Data Collection

  • Survey of the area

  • Prepared inventory of existing facilities, water supply and sewerage system

  • Prepared Master Plan details

  • Prepared layout plans for new & existing works

  • Design water supply and sewerage network

  • Prepared cost estimates, specifications and related details