Master Plan & Detailed Design of Sewerage & Water Supply System for POF
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Pakistan Ordnance Factory Cambellpur, Wah
Start Date:
1973
Completion Date:
1977

Project Description

Complete Design, Tender Documents, Sewerage System and Water Supply:

  • Maximum Supply 7.5 MGD

  • Rapid Gravity filter 5.0 MGD

  • River intake with pumping station

  • Rising mains 24" diameter

  • Underground reservoir capacity 2,500,000 gallons

  • Overhead tanks 60' height, capacity 100,000 & 200,000 gallons

  • Water distribution system 8" to 24"

  • Complete Sewerage System

 

Services

The services provided were:

  • Survey of the Project Area

  • Feasibility Study Report of the Ordnance Factory

  • Prepared Master Plan of the Project

  • Detailed design of water supply & sewerage system

  • Preparation of Drawings