
The road is approximately a kilometer long Asphalt Road, which is currently not in operation due to ground settlement. There are 2 (two) existing oil/gas pipe crossing diagonally along the road. The right of way for the repaired asphalt road and pipeline protections shall be as per Dolphin Energy and GASCO minimum Standard Requirements.
Services
It is required from the Consultant to carry out a Final Detailed Design with the preparation of Complete Tender Documents, in the line of COMPANY’s requirements for a Contractor who shall carry out the reinstatement work to the existing asphalt road including the construction of pipeline crossings and protection works for any existing utilities along the route.
The Final Detailed Design shall necessarily comply with local laws, regulations, internationally recognized codes, safety codes, standards and existing norms. Compliance with officially designated codes shall be mandatory at such time as they are formally adopted.
ECIL is providing the following Services to the Client:
Data Collection
Final Detailed Design
Preparation of Tender Documents Project