Islamabad-Peshawar Motorway is a 6 lane Dual Carriageway with full access controlled facility. The length of the motorway is 154 km. Each carriageway is 10.50 M wide with 5 meters shoulders on each side and a 5 meters median. There are three major river bridges en-route over Indus River, Kabul River and Haro River.
For the purpose of effective supervision, logistics and quality control, the motorway has been divided into following three sections:
Section - I, Islamabad to River Indus (56.70 km)
Section - II, River Indus to Rashkai including River Indus Bridge (53.8 km)
Section - III, Rashkai to Chugalpura including bridges (44.04 km)
In addition to Project Management Services, ECIL is responsible for construction supervision of Section-II of the Motorway. Whereas Engineering Associates and A.A. Associates are responsible for the construction supervision of Section-I and III respectively.
Services
Construction Supervision Services include but not limited to:
Construction/ Contract Management
Supervision of earth work, for embankment
Supervision of pavement structure construction
Supervision services for bridges and culverts
Supervision of drainage & erosion work
Supervision of ancillary items
Quality control and testing of material
Checking & verification of measurements and processing contractor invoice
Monthly Progress Reports and Identification of problem areas and advising the client accordingly
Processing of contractor monthly invoice
Processing of contractor claims