Islamabad Peshawar Motorway, Construction Supervision Services
BACK TO PROJECTS

Name of associated firm :
Engineering Associates (Pvt.) Ltd - A. A Associates (Pvt.) Ltd - Snowy Mountains Engineering Corporation - Louis Berger Int'l. Inc
Project Location within Country:
Islamabad - Peshawar
Start Date:
May 1998
Completion Date:
December 2008

Project Description

Islamabad-Peshawar Motorway is a 6 lane Dual Carriageway with full access controlled facility. The length of the motorway is 154 km. Each carriageway is 10.50 M wide with 5 meters shoulders on each side and a 5 meters median. There are three major river bridges en-route over Indus River, Kabul River and Haro River.

For the purpose of effective supervision, logistics and quality control, the motorway has been divided into following three sections:

  1. Section - I, Islamabad to River Indus (56.70 km) 

  2. Section - II, River Indus to Rashkai including River Indus Bridge (53.8 km)

  3. Section - III, Rashkai to Chugalpura including bridges (44.04 km)

In addition to Project Management Services, ECIL is responsible for construction supervision of Section-II of the Motorway. Whereas Engineering Associates and A.A. Associates are responsible for the construction supervision of Section-I and III respectively.

 

Services

Construction Supervision Services include but not limited to:

  • Construction/ Contract Management

  • Supervision of earth work, for embankment

  • Supervision of pavement structure construction

  • Supervision services for bridges and culverts

  • Supervision of drainage & erosion work

  • Supervision of ancillary items

  • Quality control and testing of material

  • Checking & verification of measurements and processing contractor invoice

  • Monthly Progress Reports and Identification of problem areas and advising the client accordingly

  • Processing of contractor monthly invoice

  • Processing of contractor claims

 