Lyari Bridge
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Karachi - Pakistan
Start Date:
1982
Completion Date:
1984

Project Description

This bridge is 900 ft. long and each span is 40'-0". It's a continuous R.C.C Portals structure.

 

Services

  • Topo-Survey

  • Hydrological Investigation

  • Detailed Design & Drawings

  • Construction Supervision

  • Monitoring

 

Other Projects In This Sector