Project Description

The project road connects Almaty in Kazakhstan with Bishkek in Kyrgyz Republic. It is 204.40 km long, 4 lane road with asphalt pavement and shoulders on either side. The project road is in bad condition and needs rehabilitation and improvement. Ministry of Transport & Communication (MOTC) invited this road improvement project and it is funded by ADB.

 

Services

Consultant undertook following tasks for field investigation, detailed design, tender documents and pre- bid services

  • Road & structure condition survey

  • Engineering survey consisting of traverse survey, topographic survey, and cross section levelling

  • Traffic & axle load survey and traffic forecast

  • Hydrological investigations & study

  • Soil Investigations

  • Geotechnical & material investigations

  • Detailed engineering design of overlay & other improvement works, including bridges & structures

  • Tender documents & cost estimates

  • Pre-bid services

 