NHA initiated the project of the Northern Bypass in order to divert port traffic to super highway, by passing the city of Karachi to avoid traffic congestion on city streets.
Karachi Northern Bypass Road takes off from the ICI Bridge and traverses through Mauripur Road, S.I.T.E Road and RCD Highway. On RCD Highway the bypass alignment turns towards new alignment at km 19+300 and then traverses in the new alignment section and joins Karachi - Hyderabad Super Highway at km 26+500. The total length of the road is 56.63 km. It is a 6 lane dual carriageway up to first km and then it becomes a 2 lane single carriageway. Two flyovers have been provided at Gulbaiand Pirracha Chowk where as two interchanges have been provided at RCD Highway and the Super Highway.
The project has been divided into following two packages for construction purpose:
Package - I: 32 km
Package - II: 24.63 km
ECIL is responsible for the construction supervision of Package-I (km 00+000 to km 32+000)
Services
Resident supervision for the construction of 32 km of Package –I
Supervision of earth work, for embankment
Supervision of pavement construction
Supervision services for bridges and culverts
Checking & verification of measurements
Quality control and testing of material
Monthly Progress Reports and Identification of problem areas and advising the client accordingly
Scrutiny of Constructors claim and advising the Client
Top supervising during maintenance period
Issuing a final inspection report
Overall contract management