In order to establish a shorter and faster route to join Dubai with the Northern Emirates of UAE. Ministry of Public Works and Housing conceived a project, Dubai-Fujairah Freeway, which upon completion of this facility the distance between the Dubai and Fujairah will reduce to half. This project starts at the intersection of the Saja Khawaneej interchange in Dubai and ends at the intersection of Fujairah Port.
Services
Wilbur Smith Associates appointed the ECIL to carry out the Alignment Stakeout, establishment of the Bench Marks and Survey of the properties which are falling within the project corridor.
ECIL carried out a detailed reconnaissance survey and got familiar with the alignment. After that the survey was carried out by using latest and sophisticated survey equipments like GPS Total Station LS 5700 and other contemporary instruments to carry out the project in the shortest possible time frame.
Following tasks had been carried out by ECIL
Detailed Reconnaissance Survey
Stakeout of the Alignment
Establishment of the Bench Marks
Survey of the Properties which fall within the project corridor