Design and Construction Supervision of Improvement & Widening of Jaglot - Skardu (KM 83.5 to KM167
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
NWFP
Start Date:
December 2005
Completion Date:
September 2008

Project Description

The project is situated in the northern area. The road takes off from KK + near Jeglot and ends at Skardu. The work consists of topographic survey, field investigation, traffic studies, pavement design, and design of highway including structures (Bridges/Culverts). Preparation of Bid Documents and construction supervision.

 

Services

  • Detailed topographic survey, including GPS, Traverse and control levelling

  • Soil investigation and testing

  • Condition survey of existing structures

  • Hydrology

  • Design of structures, (Bridge, culverts, retaining walls)

  • Traffic surveys and studies

  • Pavement Design

  • Horizontal & Vertical Alignment

  • BOQ and Engineer's Estimate

  • Condition of Contract, Project specification, etc.

  • Construction Supervision

 

Other Projects In This Sector