TA 3680-PAK: Road, Sector Development Project Preliminary Engineering Update – Punjab
BACK TO PROJECTS

Name of associated firm :
-
Project Location within Country:
Punjab - Pakistan
Start Date:
March 11, 2002
Completion Date:
October 15, 2002

Project Description

The TA primarily included:

  1. Provincial Highways (302.3 km)

  2. Core Rural Access Roads (94.6 km)

Provincial Highways

The scope of work included:

Preparation of economic feasibility and detailed engineering design of following provincial roads:

  • Pindi Bhattian - Chiniot Road (37.3 km)

  • Jhang Shorkot Road i/c Jhang Bypass (36.5 km)

  • Shorkot - Kabirwala Road (Missing 7 km Length)

  • Kabirwala - MahniSial on N-5 (13.8 km)

  • Kamalpur - Chiniot - Sargodha Road (73 km)

  • Sargodha - Khushab Road (43.7 km)

  • Jhang - TT Singh - Chichawatni Road (91 km)

Rural Access Roads

The scope of work included:

Preparation of economic feasibility and detailed engineering design of following core rural access roads:

  • Shorkot city - Shorkot Cantt. (18 km)

  • Mian Chunoon - Abdul Hakeem (26 km)

  • Bahawalnagar - Bhukkan (20.6 km)

  • Phalia - Kuthiala Sheikhan (16.8 km)

  • Sheikhupura - Hafizabad (13.2 km)

 

Services

  1. Feasibility Study (396.9 km)

  2. Detailed Design (396.9 km)

ECIL undertook following tasks for the above work at (1) & (2).

  • Road & structure condition survey

  • Engineering survey consisting of GPS survey, Monumentation, traverse survey, control, levelling and detailed topographic survey

  • Traffic survey and forecasting

  • Road roughness survey

  • Hydrological investigations & study

  • Soil investigations

  • Geotechnical & material Investigations

  • Preliminary design & rough cost estimates

  • Preliminary economic feasibility

  • Detailed Design i/c geometric design, pavement design, structural design of culverts and bridges, urban area drainage design, roadside furniture, protection works, etc.

  • Rate Analysis and Engineer's Estimate

  • Final economic feasibility

  • Tender documents i/c conditions of contract, specifications, construction drawings and BOQ

  • Prequalification document for contractors

  • TOR for supervision consultants

 

Other Projects In This Sector