The project starts from the outskirts of Jhelum City (Sarai-Alamgir), designated at km 0+000 and terminates on the outskirts of Gujranwala City at km 104+683 at the end of Gujranwala Bypass. The cumulative length of the project is 93 kilometres. The original project comprised of providing Direct Asphalt, Concrete Overlay on the existing DST pavement with strengthening/DST of shoulders for 90% of the project length with the remaining 10% required reconstruction of the existing embankment/pavement. However, after the pavement design review, Subbase, Aggregate base and 20 cm Asphalt Concrete was provided.
Services
Review of Original Pavement Design and Redesign of the pavement
Design of Horizontal Alignment/Vertical Profile
Traffic Sign Plans
Construction Supervision
Construction Supervision
- Contract Management
- Processing of contractor invoices, claims, time extension cases etc.
- Supervision of following construction activities
Earth Works
Laying of Subbase Course
Laying of Aggregate base Course
Laying of Asphalt Concrete
Construction of Stone Masonry Retaining Wall
Construction of Stone Masonry and PCC/RCC Drains
Installation of Overhead Gantry Signs
Installation of Traffic Sign
Miscellaneous Activities